Definitions (29)

1

1 Thumbs up   0 Thumbs down

load breakdown


Your load breakdown allows us to assess the impact of your project on the network and charge you the right amount.
Source: westernpower.com.au (offline)

2

1 Thumbs up   2 Thumbs down

specific purpose statement


A clear, specific purpose statement helps us understand what you need and why, your timeline and location details.
Source: westernpower.com.au (offline)

3

0 Thumbs up   0 Thumbs down

customer examples


Why do we need it?
Source: westernpower.com.au (offline)

4

0 Thumbs up   0 Thumbs down

bill of materials


The bill of materials is a TXT file based on the DDC manual created from Microstation or DQM CU EXPORT FACILITY and generated by the DQM/CAD Interface. Your bill of materials is to be provided for Design Conformance Review in accordance with Underground Distribution Schemes Manual Section 4.4.4.
Source: westernpower.com.au (offline)

5

0 Thumbs up   0 Thumbs down

cad site plan


Your CAD plan helps us better understand your work site and location of assets.  We extract data from your plan to assist us with your design.
Source: westernpower.com.au (offline)

6

0 Thumbs up   0 Thumbs down

civil ner certification


Civil NER certification verifies that the substation retaining walls are structurally sound and/or battered slopes are suitable for their purpose. This certification must be provided in accordance with the Underground Distribution Schemes Manual Section 5.3.18.
Source: westernpower.com.au (offline)

7

0 Thumbs up   0 Thumbs down

concept plan


A concept plan provides us with a view of the subdivision, the scale of the project and nature of the proposed electrical network. Together with stage timing information, we can undertake planning assessments and produce a Design Information Package.
Source: westernpower.com.au (offline)

8

0 Thumbs up   0 Thumbs down

design drawing


Design drawings are provided for Design Conformance Review in accordance with Underground Distribution Schemes Manual Section 4.4.4. The drawings must be geospatially correct by incorporation of Map Grid of Australia MGA94 grid system. Other design drawing requirements are in Appendix 4 of the Underground Distribution Schemes Manual.
Source: westernpower.com.au (offline)

9

0 Thumbs up   0 Thumbs down

disturbing loads


The information allows us to check the impact of your loads on the network.  You must comply with Power Quality limits as per AS61000.3.6 and Western Power Technical Rules.
Source: westernpower.com.au (offline)

10

0 Thumbs up   0 Thumbs down

draft design drawing


Draft design drawings provided with your application assist us to complete your Design Information Package.
Source: westernpower.com.au (offline)