1 |
Material Requirements PlanningA computerized system typically used to determine the quantity and timing requirements for production and delivery of items to both customers and suppliers. Using MRP to schedule production at various [..]
|
2 |
Material Requirements Planning(MRP) The use of computer software to plan and manage a production process, for example the amount of materials or parts required, calculation of workload, delivery schedules, etc [..]
|
3 |
Material Requirements PlanningA decision-making methodology used to determine the timing and quantities of materials to purchase.
|
4 |
Material Requirements Planning("MRP") An approach for material planning and ordering based on known or forecast demand requirements, lead times for obtaining each item, and existing inventories of all items. [D00 [..]
|
5 |
Material Requirements PlanningA computerized system typically used to determine the quantity and timing requirements for delivery and production of items. Using MRP specifically to schedule production at processes in a value strea [..]
|
6 |
Material Requirements PlanningMaterial requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for items of dependent demand. Dependent de [..]
|
7 |
Material Requirements PlanningMaterial requirements planning (MRP) is a type of planning focused on the management of processes in manufacturing industries. MRP looks at the availability of materials for production and other relat [..]
|
8 |
Material Requirements PlanningThe items that are finished products or important assemblies that have a major part in total turnover, or that dominate the production process due to the production techniques.
|
9 |
Material Requirements PlanningA dynamic safety stock.
|
10 |
Material Requirements PlanningThe number of days that the dynamic safety stock must cover requirements.
|
11 |
Material Requirements PlanningThe number of days the warehouse stock of a material is sufficient to cover requirements without taking account of any new receipts. The actual range of coverage corresponds to the safety time.
|
12 |
Material Requirements PlanningA procedure that ensures that there are enough components available for planned or production orders in production planning and production control.
|
13 |
Material Requirements PlanningThe materials for which there are missing quantities can be processed, with the backorder processing function.
|
14 |
Material Requirements PlanningA number used to specify a standard explosion date (fixed key date) for all BOM levels.
|
15 |
Material Requirements PlanningThe criterion that groups together all checking rules for all application areas for a material.
|
16 |
Material Requirements PlanningA rule that defines how the availability check is performed.
|
17 |
Material Requirements PlanningAn MRP procedure that runs in the application server implemented in the ABAP language.
|
18 |
Material Requirements PlanningA generic term for the procedure in MRP for which stock requirements and past consumption values are important.
|
19 |
Material Requirements PlanningA type of materials planning in which materials are planned according to a cycle.
|
20 |
Material Requirements PlanningAn indicator in the material master record that defines external procurement or in-house production of the material precisely.
|
21 |
Material Requirements PlanningReceipt element that is created during planning if shortages occur.
|
22 |
Material Requirements PlanningQuantity that is provided by a receipt.
|
23 |
Material Requirements PlanningA procedure that groups requirements from several periods to form a lot, in which an optimum cost ratio is determined between lot size independent costs and storage costs.
|
24 |
Material Requirements PlanningThe production end date is the planned end date of an order, excluding the safety time (float after production).
|
25 |
Material Requirements PlanningA production lot is a production quantity of an assembly (finished product or semi-finished part) that is planned and produced together with reference to a number. Using this number, you can determine [..]
|
26 |
Material Requirements PlanningThe default storage location for component withdrawal for final processing and for goods receipt of the product.
|
27 |
Material Requirements PlanningThe number of working days between the date that the order is created and the planned start date.
|
28 |
Material Requirements PlanningA profile that contains parameters for calculating the dynamic safety stock.
|
29 |
Material Requirements PlanningThe receipt days' supply displays how many days' requirements are covered by a material.
|
30 |
Material Requirements PlanningA material requirements planning run in which all materials are included in the planning run.
|
31 |
Material Requirements PlanningA check performed by the system to determine whether the requirements are covered by available warehouse stock and planned receipts from the purchasing department or from production.
|
32 |
Material Requirements PlanningExecution of material requirements planning (MRP) in a planning run in which only the materials that have had MRP-relevant changes made to them since the last planning run are rescheduled.
|
33 |
Material Requirements PlanningThe number of days before the production start date for a higher-level assembly when a lower-level component must be made available.
|
34 |
Material Requirements PlanningThe calculation of the planned start date using a planned order's planned finish date in MRP.
|
35 |
Material Requirements PlanningA group of transaction calls that are assigned to a user role and can be directly activated from the MRP list and the stock and requirements list.
|
36 |
Material Requirements PlanningA collection of data required for updating the material master record for planning.
|
37 |
Material Requirements PlanningA key that controls the MRP procedure (MRP or reorder point) used for planning a material.
|
38 |
Material Requirements PlanningThreshold value for available stock. If stock falls below this level, procurement proposals are to be generated.
|
39 |
Material Requirements PlanningA procedure in materials planning.
|
40 |
Material Requirements PlanningThe total time for the in-house production or for the external procurement of a product.
|
41 |
Material Requirements PlanningA term for all objects displayed as items in the MRP list or in the stock and requirements list.
|
42 |
Material Requirements PlanningThe MRP group, groups material from the material requirements planning point of view to allocate them control parameters for planning.
|
43 |
Material Requirements PlanningAn indicator for storage location MRP that controls whether:
|
44 |
Material Requirements PlanningA document providing an overview of the results of the material requirements planning (MRP) run.
|
45 |
Material Requirements PlanningA term for the actions of creating a production plan or procurement plan for the materials in a plant or company. During the planning run, for each material, the system calls either classic MRP or MRP [..]
|
46 |
Material Requirements PlanningA key that defines which lot-sizing procedure the system uses for calculating the quantity to procure in the MRP run.
|
47 |
Material Requirements PlanningA procedure in which the lot size is calculated using the quantities entered in the material master record of the material.
|
48 |
Material Requirements PlanningThe number of days the available plant stock covers requirements.
|
49 |
Material Requirements PlanningA term for procedures in materials planning that take into account and plan every future requirement during the creation of procurement proposals such as independent requirements, or dependent require [..]
|
50 |
Material Requirements PlanningA term for the actions of creating a production plan or procurement plan for the materials in a plant or company.
|
51 |
Material Requirements PlanningThe execution of materials planning for all materials or assemblies that have the necessary entries in the planning file.
|
52 |
Material Requirements PlanningA shortage that occurs when the requirements quantity is greater than the receipt and stock quantity.
|
53 |
Material Requirements PlanningThe sum of all requirement quantities in a month or within a definable number of months.
|
54 |
Material Requirements PlanningThe date for materials planning on which the material is required.
|
55 |
Material Requirements PlanningA process in requirements planning with which totals records for dependent requirements are created in the planning run.
|
56 |
Material Requirements PlanningAn automatic check during a planning run that checks whether receipts such as firmed planned orders, firmed purchase requisitions, or schedule lines:
|
57 |
Material Requirements PlanningA proposal from materials planning to reschedule a planned inward stock movement, for example, a production order or a purchase order, which has been firmed but is not required for this date.
|
58 |
Material Requirements PlanningA quantity by which a requirement exceeds the available quantity.
|
59 |
Material Requirements PlanningThe lower-limit for the dynamic safety stock.
|
60 |
Material Requirements PlanningMinimum quantity that must be reached during procurement.
|
61 |
Material Requirements PlanningThe minimum number of days that the dynamic safety stock must cover requirements.
|
62 |
Material Requirements PlanningThe system rounds up the procurement quantity to a multiple of this value.
|
63 |
Material Requirements PlanningThe quantity of stock to satisfy high requirements in the stocking-up period.
|
64 |
Material Requirements PlanningThe number of days the warehouse stock of a material is sufficient to cover requirements without taking account of any new receipts. The safety time corresponds to the actual range of coverage.
|
65 |
Material Requirements PlanningAn indicator in the material master record that refers to a group of time intervals that are relevant to material requirements planning.
|
66 |
Material Requirements PlanningMaximum quantity that can be stored for a certain material.
|
67 |
Material Requirements PlanningAn upper-limit for the dynamic safety stock.
|
68 |
Material Requirements PlanningThe maximum number of days that the dynamic safety stock must cover requirements.
|
69 |
Material Requirements PlanningA quantity that must not be exceeded during procurement.
|
70 |
Material Requirements PlanningA generic term for the activities involved in creating a master production schedule or an external procurement plan for all the materials in a plant or company.
|
71 |
Material Requirements PlanningAn overview tree in the MRP list and the stock and requirements list.
|
72 |
Material Requirements PlanningThe period of time, to which the importing of MRP elements to the stock and requirements list can be restricted.
|
73 |
Material Requirements PlanningA rule, consisting of a group of MRP elements and stocks, that controls the selection of this data in the stock and requirements list and the planning table for Repetitive Manufacturing:
|
74 |
Material Requirements PlanningA percentage indicating the proportion of required quantities of materials covered by stock on hand in the warehouse or stores.
|
75 |
Material Requirements PlanningA procedure in material requirements planning where the MRP controller must create the order proposals manually.
|
76 |
Material Requirements PlanningA procedure in consumption-based planning.
|
77 |
Material Requirements PlanningThe system can be prevented from making automatic changes to order proposals, such as planned orders, purchase requisitions, or schedule lines in the planning run in the near future by using the manua [..]
|
78 |
Material Requirements PlanningGeneric term denoting a facility enabling you to combine materials to form APO supersession chains or product groups.
|
79 |
Material Requirements PlanningAn up-to-date overview of the stock of a material.
|
80 |
Material Requirements PlanningThe costs incurred from the storage of a material.
|
81 |
Material Requirements PlanningAn indicator that specifies the percentage rate for storage costs that is used for the procurement quantity calculation.
|
82 |
Material Requirements PlanningA list of all materials planned in the planning run.
|
83 |
Material Requirements PlanningNumber of days into the future that a material covers requirements if only plant stock is taken into consideration.
|
84 |
Material Requirements PlanningPeriod that is defined for net change planning in the planning horizon.
|
85 |
Material Requirements PlanningA procedure in material requirements planning for calculating the lot-size that optimizes total setup and storage costs (optimized lot-sizing procedure).
|
86 |
Material Requirements PlanningA material that a customer or a vendor supplies for use in the production of goods specified in the order.
|
87 |
Material Requirements PlanningA function for determining the requirements quantities and dates of intermediate products and finished products that are the source of a fixed and planned receipt at a specific production level.
|
88 |
Material Requirements PlanningThe next higher level of the bill of material that is the source of the requirement in a lower level, in the evaluations for material requirements planning.
|
89 |
Material Requirements PlanningA display of the pegged requirements of a requirement element in the MRP list.
|
90 |
Material Requirements PlanningAn evaluation that displays the source requirements or the source procurement proposal of a chosen MRP element.
|
91 |
Material Requirements PlanningThe requirements for non-combinable finished products and for combinable finished products and assemblies, created based on a sales order.
|
92 |
Material Requirements PlanningThe total of all requirement quantities from one day or from a definable number of days.
|
93 |
Material Requirements PlanningThe planned material requirements that are caused by the production of higher-level assemblies.
|
94 |
Material Requirements PlanningA function that initiates procurement without stockholding.
|
95 |
Material Requirements PlanningThe production without stockholding.
|
96 |
Material Requirements PlanningThe grouping of related items in a BOM that are discontinued together.
|
97 |
Material Requirements PlanningThe time horizon to which the display of information in the MRP list andthe stock and requirements list can be limited.
|
98 |
Material Requirements PlanningThe information on exceptional situations that occurred during the planning run.
|
99 |
Material Requirements PlanningA procedure that groups requirement quantities from one or several periods to form a lot size.
|
100 |
Material Requirements PlanningThe period of adjustment is the period in which the planned independent requirements are not taken into account in the net requirements calculation.
|
101 |
Material Requirements PlanningA division of the time axis into periods, for example, days, weeks, or months.
|
102 |
Material Requirements PlanningThe criterion for lot-size calculation in the static lot-sizing procedure.
|
103 |
Material Requirements PlanningA procedure in consumption-based planning that is based on future requirements predictions calculated using the forecast.
|
104 |
Material Requirements PlanningA procedure for lot-size calculation in materials planning with optimization of the sum of setup costs plus storage costs (optimum lot-sizing procedure).
|
105 |
Material Requirements PlanningA logical grouping of materials.
|
106 |
Material Requirements PlanningThe lowest level that a material appears in a product structure.
|
107 |
Material Requirements PlanningThe low-level code defines the sequence in which all materials included in the planning run are planned.
|
108 |
Material Requirements PlanningA criterion for calculating the lot size in static lot-sizing procedures.
|
109 |
Material Requirements PlanningThe costs that occur for each purchase order or production order above the purchase order price or the cost of production regardless of the lot size.
|
110 |
Material Requirements PlanningA procedure in material requirements planning used to calculate order and production quantities (lot sizes).
|
111 |
Material Requirements PlanningA quantity that is received to stock or produced in one production run, and that has the same production costs and specifications.
|
112 |
Material Requirements PlanningA quantity to produce or procure.
|
113 |
Material Requirements PlanningA long-term planned orders are simulative planned orders that are used in long-term planning.
|
114 |
Material Requirements PlanningA storage location from which components are withdrawn for production.
|
115 |
Material Requirements PlanningThe types of planning run include:
|
116 |
Material Requirements PlanningA control indicator that you set to make changes made in BOMs, Customizing, and certain material master data affect MRP.
|
117 |
Material Requirements PlanningMaterial requirements planning at storage location level. Storage location stock is not included in the available stock at plant level because the stocks are considered separately.
|
118 |
Material Requirements PlanningA defined period in which the system makes no automatic changes to the master plan during material requirements planning.
|
119 |
Material Requirements PlanningAn MRP area represents an organizational unit for which you can perform material requirements planning separately.
|
120 |
Material Requirements PlanningThe parts or products, in master production scheduling, that influence company profits or that take up critical resources are planned.
|
121 |
Material Requirements PlanningThe total of all requirements that occur in one or a selected number of definable periods.
|
122 |
Material Requirements PlanningA part of the optimum lot-sizing procedure.
|
123 |
Material Requirements PlanningA filter consisting of time information, MRP elements, and MRP segments.
|
124 |
Material Requirements PlanningThe number of days required to procure the material through external procurement.
|
125 |
Material Requirements PlanningA planned requirement quantity for a finished product in a period of time.
|
126 |
Material Requirements PlanningA request created in the planning run for a plant to trigger the procurement of a plant material for a certain quantity for a specific date.
|
127 |
Material Requirements PlanningA planned order that is created by the system during the procurement "Stock transfer from another plant" if the creation indicator for purchase requisition "Planned order" has been [..]
|
128 |
Material Requirements PlanningA function that calculates production dates and creates capacity requirements.
|
129 |
Material Requirements PlanningA procedure for lot-size calculation with optimization of the sum of setup plus storage costs (optimum lot-sizing procedure).
|
130 |
Material Requirements PlanningThe total of all requirement quantities for a week or a definable number of weeks.
|
131 |
Material Requirements PlanningThe definition of flexible period lengths at plant level.
|
132 |
Material Requirements PlanningA cycle in which the planning run is performed for a material.
|
133 |
Material Requirements PlanningA file that contains a list of all materials for which a change relevant to requirements planning has occurred and that are automatically flagged for planning.
|
134 |
Material Requirements PlanningA material entry in the planning file.
|
135 |
Material Requirements PlanningA system to support manufacturing and fabrication organisations by the timely release of production and purchase orders using the production plan for finished goods to determine the materials required [..]
|