Meaning Material Requirements Planning
What does Material Requirements Planning mean? Here you find 135 meanings of the word Material Requirements Planning. You can also add a definition of Material Requirements Planning yourself

1

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A computerized system typically used to determine the quantity and timing requirements for production and delivery of items to both customers and suppliers. Using MRP to schedule production at various [..]
Source: asq.org

2

0 Thumbs up   0 Thumbs down

Material Requirements Planning


(MRP) The use of computer software to plan and manage a production process, for example the amount of materials or parts required, calculation of workload, delivery schedules, etc [..]
Source: businessballs.com

3

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A decision-making methodology used to determine the timing and quantities of materials to purchase.
Source: inboundlogistics.com

4

0 Thumbs up   0 Thumbs down

Material Requirements Planning


("MRP") An approach for material planning and ordering based on known or forecast demand requirements, lead times for obtaining each item, and existing inventories of all items. [D00 [..]
Source: maxwideman.com

5

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A computerized system typically used to determine the quantity and timing requirements for delivery and production of items. Using MRP specifically to schedule production at processes in a value strea [..]
Source: instituteopex.org

6

0 Thumbs up   0 Thumbs down

Material Requirements Planning


Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for items of dependent demand. Dependent de [..]
Source: definitions.uslegal.com

7

0 Thumbs up   0 Thumbs down

Material Requirements Planning


Material requirements planning (MRP) is a type of planning focused on the management of processes in manufacturing industries. MRP looks at the availability of materials for production and other relat [..]
Source: techopedia.com

8

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The items that are finished products or important assemblies that have a major part in total turnover, or that dominate the production process due to the production techniques.
Source: help.sap.com

9

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A dynamic safety stock.
Source: help.sap.com

10

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The number of days that the dynamic safety stock must cover requirements.
Source: help.sap.com

11

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The number of days the warehouse stock of a material is sufficient to cover requirements without taking account of any new receipts. The actual range of coverage corresponds to the safety time.
Source: help.sap.com

12

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A procedure that ensures that there are enough components available for planned or production orders in production planning and production control.
Source: help.sap.com

13

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The materials for which there are missing quantities can be processed, with the backorder processing function.
Source: help.sap.com

14

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A number used to specify a standard explosion date (fixed key date) for all BOM levels.
Source: help.sap.com

15

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The criterion that groups together all checking rules for all application areas for a material.
Source: help.sap.com

16

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A rule that defines how the availability check is performed.
Source: help.sap.com

17

0 Thumbs up   0 Thumbs down

Material Requirements Planning


An MRP procedure that runs in the application server implemented in the ABAP language.
Source: help.sap.com

18

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A generic term for the procedure in MRP for which stock requirements and past consumption values are important.
Source: help.sap.com

19

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A type of materials planning in which materials are planned according to a cycle.
Source: help.sap.com

20

0 Thumbs up   0 Thumbs down

Material Requirements Planning


An indicator in the material master record that defines external procurement or in-house production of the material precisely.
Source: help.sap.com

21

0 Thumbs up   0 Thumbs down

Material Requirements Planning


Receipt element that is created during planning if shortages occur.
Source: help.sap.com

22

0 Thumbs up   0 Thumbs down

Material Requirements Planning


Quantity that is provided by a receipt.
Source: help.sap.com

23

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A procedure that groups requirements from several periods to form a lot, in which an optimum cost ratio is determined between lot size independent costs and storage costs.
Source: help.sap.com

24

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The production end date is the planned end date of an order, excluding the safety time (float after production).
Source: help.sap.com

25

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A production lot is a production quantity of an assembly (finished product or semi-finished part) that is planned and produced together with reference to a number. Using this number, you can determine [..]
Source: help.sap.com

26

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The default storage location for component withdrawal for final processing and for goods receipt of the product.
Source: help.sap.com

27

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The number of working days between the date that the order is created and the planned start date.
Source: help.sap.com

28

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A profile that contains parameters for calculating the dynamic safety stock.
Source: help.sap.com

29

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The receipt days' supply displays how many days' requirements are covered by a material.
Source: help.sap.com

30

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A material requirements planning run in which all materials are included in the planning run.
Source: help.sap.com

31

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A check performed by the system to determine whether the requirements are covered by available warehouse stock and planned receipts from the purchasing department or from production.
Source: help.sap.com

32

0 Thumbs up   0 Thumbs down

Material Requirements Planning


Execution of material requirements planning (MRP) in a planning run in which only the materials that have had MRP-relevant changes made to them since the last planning run are rescheduled.
Source: help.sap.com

33

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The number of days before the production start date for a higher-level assembly when a lower-level component must be made available.
Source: help.sap.com

34

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The calculation of the planned start date using a planned order's planned finish date in MRP.
Source: help.sap.com

35

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A group of transaction calls that are assigned to a user role and can be directly activated from the MRP list and the stock and requirements list.
Source: help.sap.com

36

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A collection of data required for updating the material master record for planning.
Source: help.sap.com

37

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A key that controls the MRP procedure (MRP or reorder point) used for planning a material.
Source: help.sap.com

38

0 Thumbs up   0 Thumbs down

Material Requirements Planning


Threshold value for available stock. If stock falls below this level, procurement proposals are to be generated.
Source: help.sap.com

39

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A procedure in materials planning.
Source: help.sap.com

40

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The total time for the in-house production or for the external procurement of a product.
Source: help.sap.com

41

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A term for all objects displayed as items in the MRP list or in the stock and requirements list.
Source: help.sap.com

42

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The MRP group, groups material from the material requirements planning point of view to allocate them control parameters for planning.
Source: help.sap.com

43

0 Thumbs up   0 Thumbs down

Material Requirements Planning


An indicator for storage location MRP that controls whether:
Source: help.sap.com

44

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A document providing an overview of the results of the material requirements planning (MRP) run.
Source: help.sap.com

45

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A term for the actions of creating a production plan or procurement plan for the materials in a plant or company. During the planning run, for each material, the system calls either classic MRP or MRP [..]
Source: help.sap.com

46

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A key that defines which lot-sizing procedure the system uses for calculating the quantity to procure in the MRP run.
Source: help.sap.com

47

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A procedure in which the lot size is calculated using the quantities entered in the material master record of the material.
Source: help.sap.com

48

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The number of days the available plant stock covers requirements.
Source: help.sap.com

49

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A term for procedures in materials planning that take into account and plan every future requirement during the creation of procurement proposals such as independent requirements, or dependent require [..]
Source: help.sap.com

50

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A term for the actions of creating a production plan or procurement plan for the materials in a plant or company.
Source: help.sap.com

51

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The execution of materials planning for all materials or assemblies that have the necessary entries in the planning file.
Source: help.sap.com

52

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A shortage that occurs when the requirements quantity is greater than the receipt and stock quantity.
Source: help.sap.com

53

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The sum of all requirement quantities in a month or within a definable number of months.
Source: help.sap.com

54

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The date for materials planning on which the material is required.
Source: help.sap.com

55

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A process in requirements planning with which totals records for dependent requirements are created in the planning run.
Source: help.sap.com

56

0 Thumbs up   0 Thumbs down

Material Requirements Planning


An automatic check during a planning run that checks whether receipts such as firmed planned orders, firmed purchase requisitions, or schedule lines:
Source: help.sap.com

57

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A proposal from materials planning to reschedule a planned inward stock movement, for example, a production order or a purchase order, which has been firmed but is not required for this date.
Source: help.sap.com

58

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A quantity by which a requirement exceeds the available quantity.
Source: help.sap.com

59

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The lower-limit for the dynamic safety stock.
Source: help.sap.com

60

0 Thumbs up   0 Thumbs down

Material Requirements Planning


Minimum quantity that must be reached during procurement.
Source: help.sap.com

61

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The minimum number of days that the dynamic safety stock must cover requirements.
Source: help.sap.com

62

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The system rounds up the procurement quantity to a multiple of this value.
Source: help.sap.com

63

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The quantity of stock to satisfy high requirements in the stocking-up period.
Source: help.sap.com

64

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The number of days the warehouse stock of a material is sufficient to cover requirements without taking account of any new receipts. The safety time corresponds to the actual range of coverage.
Source: help.sap.com

65

0 Thumbs up   0 Thumbs down

Material Requirements Planning


An indicator in the material master record that refers to a group of time intervals that are relevant to material requirements planning.
Source: help.sap.com

66

0 Thumbs up   0 Thumbs down

Material Requirements Planning


Maximum quantity that can be stored for a certain material.
Source: help.sap.com

67

0 Thumbs up   0 Thumbs down

Material Requirements Planning


An upper-limit for the dynamic safety stock.
Source: help.sap.com

68

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The maximum number of days that the dynamic safety stock must cover requirements.
Source: help.sap.com

69

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A quantity that must not be exceeded during procurement.
Source: help.sap.com

70

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A generic term for the activities involved in creating a master production schedule or an external procurement plan for all the materials in a plant or company.
Source: help.sap.com

71

0 Thumbs up   0 Thumbs down

Material Requirements Planning


An overview tree in the MRP list and the stock and requirements list.
Source: help.sap.com

72

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The period of time, to which the importing of MRP elements to the stock and requirements list can be restricted.
Source: help.sap.com

73

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A rule, consisting of a group of MRP elements and stocks, that controls the selection of this data in the stock and requirements list and the planning table for Repetitive Manufacturing:
Source: help.sap.com

74

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A percentage indicating the proportion of required quantities of materials covered by stock on hand in the warehouse or stores.
Source: help.sap.com

75

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A procedure in material requirements planning where the MRP controller must create the order proposals manually.
Source: help.sap.com

76

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A procedure in consumption-based planning.
Source: help.sap.com

77

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The system can be prevented from making automatic changes to order proposals, such as planned orders, purchase requisitions, or schedule lines in the planning run in the near future by using the manua [..]
Source: help.sap.com

78

0 Thumbs up   0 Thumbs down

Material Requirements Planning


Generic term denoting a facility enabling you to combine materials to form APO supersession chains or product groups.
Source: help.sap.com

79

0 Thumbs up   0 Thumbs down

Material Requirements Planning


An up-to-date overview of the stock of a material.
Source: help.sap.com

80

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The costs incurred from the storage of a material.
Source: help.sap.com

81

0 Thumbs up   0 Thumbs down

Material Requirements Planning


An indicator that specifies the percentage rate for storage costs that is used for the procurement quantity calculation.
Source: help.sap.com

82

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A list of all materials planned in the planning run.
Source: help.sap.com

83

0 Thumbs up   0 Thumbs down

Material Requirements Planning


Number of days into the future that a material covers requirements if only plant stock is taken into consideration.
Source: help.sap.com

84

0 Thumbs up   0 Thumbs down

Material Requirements Planning


Period that is defined for net change planning in the planning horizon.
Source: help.sap.com

85

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A procedure in material requirements planning for calculating the lot-size that optimizes total setup and storage costs (optimized lot-sizing procedure).
Source: help.sap.com

86

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A material that a customer or a vendor supplies for use in the production of goods specified in the order.
Source: help.sap.com

87

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A function for determining the requirements quantities and dates of intermediate products and finished products that are the source of a fixed and planned receipt at a specific production level.
Source: help.sap.com

88

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The next higher level of the bill of material that is the source of the requirement in a lower level, in the evaluations for material requirements planning.
Source: help.sap.com

89

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A display of the pegged requirements of a requirement element in the MRP list.
Source: help.sap.com

90

0 Thumbs up   0 Thumbs down

Material Requirements Planning


An evaluation that displays the source requirements or the source procurement proposal of a chosen MRP element.
Source: help.sap.com

91

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The requirements for non-combinable finished products and for combinable finished products and assemblies, created based on a sales order.
Source: help.sap.com

92

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The total of all requirement quantities from one day or from a definable number of days.
Source: help.sap.com

93

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The planned material requirements that are caused by the production of higher-level assemblies.
Source: help.sap.com

94

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A function that initiates procurement without stockholding.
Source: help.sap.com

95

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The production without stockholding.
Source: help.sap.com

96

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The grouping of related items in a BOM that are discontinued together.
Source: help.sap.com

97

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The time horizon to which the display of information in the MRP list andthe stock and requirements list can be limited.
Source: help.sap.com

98

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The information on exceptional situations that occurred during the planning run.
Source: help.sap.com

99

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A procedure that groups requirement quantities from one or several periods to form a lot size.
Source: help.sap.com

100

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The period of adjustment is the period in which the planned independent requirements are not taken into account in the net requirements calculation.
Source: help.sap.com

101

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A division of the time axis into periods, for example, days, weeks, or months.
Source: help.sap.com

102

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The criterion for lot-size calculation in the static lot-sizing procedure.
Source: help.sap.com

103

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A procedure in consumption-based planning that is based on future requirements predictions calculated using the forecast.
Source: help.sap.com

104

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A procedure for lot-size calculation in materials planning with optimization of the sum of setup costs plus storage costs (optimum lot-sizing procedure).
Source: help.sap.com

105

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A logical grouping of materials.
Source: help.sap.com

106

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The lowest level that a material appears in a product structure.
Source: help.sap.com

107

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The low-level code defines the sequence in which all materials included in the planning run are planned.
Source: help.sap.com

108

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A criterion for calculating the lot size in static lot-sizing procedures.
Source: help.sap.com

109

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The costs that occur for each purchase order or production order above the purchase order price or the cost of production regardless of the lot size.
Source: help.sap.com

110

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A procedure in material requirements planning used to calculate order and production quantities (lot sizes).
Source: help.sap.com

111

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A quantity that is received to stock or produced in one production run, and that has the same production costs and specifications.
Source: help.sap.com

112

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A quantity to produce or procure.
Source: help.sap.com

113

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A long-term planned orders are simulative planned orders that are used in long-term planning.
Source: help.sap.com

114

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A storage location from which components are withdrawn for production.
Source: help.sap.com

115

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The types of planning run include:
Source: help.sap.com

116

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A control indicator that you set to make changes made in BOMs, Customizing, and certain material master data affect MRP.
Source: help.sap.com

117

0 Thumbs up   0 Thumbs down

Material Requirements Planning


Material requirements planning at storage location level. Storage location stock is not included in the available stock at plant level because the stocks are considered separately.
Source: help.sap.com

118

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A defined period in which the system makes no automatic changes to the master plan during material requirements planning.
Source: help.sap.com

119

0 Thumbs up   0 Thumbs down

Material Requirements Planning


An MRP area represents an organizational unit for which you can perform material requirements planning separately.
Source: help.sap.com

120

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The parts or products, in master production scheduling, that influence company profits or that take up critical resources are planned.
Source: help.sap.com

121

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The total of all requirements that occur in one or a selected number of definable periods.
Source: help.sap.com

122

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A part of the optimum lot-sizing procedure.
Source: help.sap.com

123

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A filter consisting of time information, MRP elements, and MRP segments.
Source: help.sap.com

124

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The number of days required to procure the material through external procurement.
Source: help.sap.com

125

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A planned requirement quantity for a finished product in a period of time.
Source: help.sap.com

126

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A request created in the planning run for a plant to trigger the procurement of a plant material for a certain quantity for a specific date.
Source: help.sap.com

127

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A planned order that is created by the system during the procurement "Stock transfer from another plant" if the creation indicator for purchase requisition "Planned order" has been [..]
Source: help.sap.com

128

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A function that calculates production dates and creates capacity requirements.
Source: help.sap.com

129

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A procedure for lot-size calculation with optimization of the sum of setup plus storage costs (optimum lot-sizing procedure).
Source: help.sap.com

130

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The total of all requirement quantities for a week or a definable number of weeks.
Source: help.sap.com

131

0 Thumbs up   0 Thumbs down

Material Requirements Planning


The definition of flexible period lengths at plant level.
Source: help.sap.com

132

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A cycle in which the planning run is performed for a material.
Source: help.sap.com

133

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A file that contains a list of all materials for which a change relevant to requirements planning has occurred and that are automatically flagged for planning.
Source: help.sap.com

134

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A material entry in the planning file.
Source: help.sap.com

135

0 Thumbs up   0 Thumbs down

Material Requirements Planning


A system to support manufacturing and fabrication organisations by the timely release of production and purchase orders using the production plan for finished goods to determine the materials required [..]
Source: logisticsbureau.com