1 |
Post-petitionThe capability of the ISO Controlled Grid, measured in MW and determined through a ISO Deliverability Assessment, to support the interconnection with Full Capacity Deliverability Status or Partial Cap [..]
|
<< PTP CRR | PSS >> |