Production Planning and Detailed SchedulingThe time-continuous capacity of a resource facilitates exact-time scheduling, in which the production dates/times are determined exactly (that is, down to the second).
|
2 |
Production Planning and Detailed SchedulingTime interval between the earliest start date of the optimized plan and the end of the last unfixed operation in the optimization horizon, that is, in the time interval to be optimized.
|
3 |
Production Planning and Detailed SchedulingVendor who manufactures an ordered product for an ordering party, for whom required components are to be provided by the ordering party or a third party. (In subcontracting, these components are calle [..]
|
4 |
Production Planning and Detailed SchedulingRepresents a stock level that should be reached through planning in order to smooth out production and cover sporadic requirements.
|
5 |
Production Planning and Detailed SchedulingActivity that the system executes immediately in Production Planning and Detailed Scheduling (PP/DS) if a planning-relevant event occurs for a product.
|
6 |
Production Planning and Detailed SchedulingDetailed scheduling activity used to assign a new date or new resources to a deallocated operation.
|
7 |
Production Planning and Detailed SchedulingGroup of components of a product which form a technically coherent whole in the production process.
|
8 |
Production Planning and Detailed SchedulingPercentage of the quantity of an assembly that does not meet the required production quality.
|
9 |
Production Planning and Detailed SchedulingPlanning that is executed automatically by the system.
|
10 |
Production Planning and Detailed SchedulingDate defined by the specific day and time on which the total quantity provided by the receipt element is made available. Possible receipt processing is completed on the availability date.
|
11 |
Production Planning and Detailed SchedulingOperations that can be scheduled that are scheduled before the start date of planning (that is, in the past).
|
12 |
Production Planning and Detailed SchedulingA protected period (for example, between two activities of an operation) in which you cannot schedule other activities from other operations (from other orders).
|
13 |
Production Planning and Detailed SchedulingResource which limits the throughput capability of the production or of the entire supply chain.
|
14 |
Production Planning and Detailed SchedulingPlanned non-working time during the regular working time of a resource.
|
15 |
Production Planning and Detailed SchedulingA time period.
|
16 |
Production Planning and Detailed SchedulingDetermines the size and start date and time of the bucket.
|
17 |
Production Planning and Detailed SchedulingStandard procedure in the CTP process based on PP/DS buckets. SAP APO uses this procedure to execute a period-oriented capacity check and to reserve capacity for important resources.
|
18 |
Production Planning and Detailed SchedulingThe resource in a mode whose working and non-working times are essential for scheduling an activity; that is, the factory calendar and the shift sequence for this resource determine on which date an a [..]
|
19 |
Production Planning and Detailed SchedulingGraphical representation of a production campaign in the resource chart of the detailed scheduling planning board.
|
20 |
Production Planning and Detailed SchedulingColor of the campaign bar that can be assigned manually or automatically for a production campaign.
|
21 |
Production Planning and Detailed SchedulingAutomatic planning procedure that schedules orders at the same bottleneck resource in an optimum sequence and combines them into production campaigns. Storage costs and setup costs particular are part [..]
|
22 |
Production Planning and Detailed SchedulingProduction planning process with the main aim of reducing the storage costs and setup costs for products manufactured in-house.
|
23 |
Production Planning and Detailed SchedulingStatus of a production campaign that is derived from the statuses of the orders contained in the campaign.
|
24 |
Production Planning and Detailed SchedulingDescribes how much productive time and how much capacity a resource requires to carry out an activity; it is therefore determined by the net duration and the resource consumption of the activity.
|
25 |
Production Planning and Detailed SchedulingThe act of allocating capacity on a PP/DS resource for one or more customers.
|
26 |
Production Planning and Detailed SchedulingA container to group descriptive characteristics.
|
27 |
Production Planning and Detailed SchedulingScheduling function by which the system tries to schedule deallocated operations or complete orders with the smallest possible time intervals between the operations.
|
28 |
Production Planning and Detailed SchedulingHeuristic for planning products for which continuous material flows (that is, continuous receipts or requirements) can occur.
|
29 |
Production Planning and Detailed SchedulingProduction Planning heuristic.
|
30 |
Production Planning and Detailed SchedulingDefines which action is carried out by Production Planning and Detailed Scheduling (PP/DS) in SAP APO for each planning-relevant event that can occur for a location product, if this event occurs.
|
31 |
Production Planning and Detailed SchedulingPeriod such as a day or week.
|
32 |
Production Planning and Detailed SchedulingThe PP/DS bucket capacity of a resource enables a period-based capacity check. A bucket may be a day, a week or a month.
|
33 |
Production Planning and Detailed SchedulingTime segment in which Production Planning and Detailed Scheduling (PP/DS) can automatically create, change, or delete receipts.
|
34 |
Production Planning and Detailed SchedulingPeriod during which planning for a product cannot be changed by certain procurement planning functions and heuristics.
|
35 |
Production Planning and Detailed SchedulingClassification of a message according to the message trigger.
|
36 |
Production Planning and Detailed SchedulingMinimum interval between two activities of an order. Due to procedural or technical creation restrictions, the time interval between two activities must not fall below the process-related minimum inte [..]
|
37 |
Production Planning and Detailed SchedulingHeuristic that can execute procurement planning for a product and which can therefore be used as a product heuristic.
|
38 |
Production Planning and Detailed SchedulingProfile that contains settings for optimization in Production Planning and Detailed Scheduling.
|
39 |
Production Planning and Detailed SchedulingAn area for which the system optimizes the schedule during optimization.
|
40 |
Production Planning and Detailed SchedulingTimeline that represents the filling of a product into a container resource or the removal of the product from that resource. The product flow is assigned to the activity and is a prerequisite for pla [..]
|
41 |
Production Planning and Detailed SchedulingDescribes the heuristic that is entered in the location product master.
|
42 |
Production Planning and Detailed SchedulingThe assignment of multiple container resources to a product belonging to a production source of supply, such as PPM or PDS.
|
43 |
Production Planning and Detailed SchedulingOrder that maps the substitution of a product by another product.
|
44 |
Production Planning and Detailed SchedulingA component supplied to a subcontractor by the ordering party and/or a third party for producing the ordered product.
|
45 |
Production Planning and Detailed SchedulingTime relationship between two activities of an operation.
|
46 |
Production Planning and Detailed SchedulingPlanning interface in Production Planning and Detailed Scheduling in which all requirements, stock and receipt elements are displayed for a location product.
|
47 |
Production Planning and Detailed SchedulingCombining of orders to manufacture products on a production line without having to perform major setup activities.
|
48 |
Production Planning and Detailed SchedulingA module in APO that enables the production within a plant to be planned while, at the same time, taking product and capacity constraints into account. The aim of this module is to increase throughput [..]
|
49 |
Production Planning and Detailed SchedulingLocation in which the system creates the dependent requirements of the components for a product produced in-house and the receipts for the co-products and by-products.
|
50 |
Production Planning and Detailed SchedulingProduction order used for discrete manufacturing.
|
51 |
Production Planning and Detailed SchedulingExecution of background planning with heuristics or planning functions.
|
52 |
Production Planning and Detailed SchedulingThe usable working time for a resource. The system determines the productive time using the working time data and utilization rate for the resource as follows:
|
53 |
Production Planning and Detailed SchedulingDate on which a production order or a purchase order is created.
|
54 |
Production Planning and Detailed SchedulingProduct-specific time period during which a planned order or a purchase requisition should be converted into a manufacturing order or a purchase order.
|
55 |
Production Planning and Detailed SchedulingAn SAP SCM order type, which represents a logistical view of a project that is created and executed in an external system (for example, a network in an ERP system).
|
56 |
Production Planning and Detailed SchedulingCreate a production order or a purchase order, for example, manually or by converting a planned order or purchase requisition.
|
57 |
Production Planning and Detailed SchedulingSelection of resources and products for which planning can be changed.
|
58 |
Production Planning and Detailed SchedulingA time interval in minutes with which you can specify the earliest possible scheduling time for operations.
|
59 |
Production Planning and Detailed SchedulingA scheduling heuristic that creates a feasible master production schedule starting with raw materials and semi-finished products for which no requirements exist in the system. If no consumer is availa [..]
|
60 |
Production Planning and Detailed SchedulingSubfunction in extended order generation.
|
61 |
Production Planning and Detailed SchedulingElement of an order that represents the availability date and the quantity of a product that is provided by the order (see also order).
|
62 |
Production Planning and Detailed SchedulingQuantity of a product that is provided by a receipt.
|
63 |
Production Planning and Detailed SchedulingResource that you use to define the capacity of another resource.
|
64 |
Production Planning and Detailed SchedulingThe linking between the start and end time points between two activities within an order (order-internal relationship) or between two activities from different orders (cross-order relationship).
|
65 |
Production Planning and Detailed SchedulingGantt diagram in the DS planning board in which the position of operations or orders at the resources and the relationships between these objects (time relationships or pegging relationships) are disp [..]
|
66 |
Production Planning and Detailed SchedulingLead time for all orders that belong to a pegging structure.
|
67 |
Production Planning and Detailed SchedulingProperty of a quantity denoting that it is relevant to the net requirement calculation and to dynamic pegging.
|
68 |
Production Planning and Detailed SchedulingHeuristic for Repetitive Manufacturing (REM).
|
69 |
Production Planning and Detailed SchedulingScheduling situation at a resource with several overlapping operations.
|
70 |
Production Planning and Detailed SchedulingEnhancement for order generation in Production Planning and Detailed Scheduling (PP/DS).
|
71 |
Production Planning and Detailed SchedulingA heuristic that enables flexible finite scheduling (bucket or time-continuous) on alternative resources, modes, or sources of supply, in order to meet due dates and to minimize setup times on the sch [..]
|
72 |
Production Planning and Detailed SchedulingPlanning run with an MRP heuristic.
|
73 |
Production Planning and Detailed SchedulingThreshold value for the days' supply of a location product, below which procurement proposals should be created for the location product.
|
74 |
Production Planning and Detailed SchedulingHeuristic that can process products in the sequence of their low-level codes.
|
75 |
Production Planning and Detailed SchedulingDS planning board chart that is always displayed in the detailed scheduling planning board and cannot be manually hidden or displayed.
|
76 |
Production Planning and Detailed SchedulingPosition on the production line where you can backflush.
|
77 |
Production Planning and Detailed SchedulingAn order that is created using Multiple Output Planning (MOP). An MOP order can contain just one operation - to divide a product - and a requirement node relevant to the division because only the char [..]
|
78 |
Production Planning and Detailed SchedulingThe quantity of a product that is required in a location at a specific date.
|
79 |
Production Planning and Detailed SchedulingDate and time at which a product is required.
|
80 |
Production Planning and Detailed SchedulingElement of an order that represents the requirements date and a requirements quantity for a product required by the order.
|
81 |
Production Planning and Detailed SchedulingPlanning interface in Production Planning and Detailed Scheduling in which all requirements elements are displayed for selected location products.
|
82 |
Production Planning and Detailed SchedulingDetailed scheduling activity used to determine a new date or new resources for a scheduled operation, on which the operation should be processed.
|
83 |
Production Planning and Detailed SchedulingCapacity of a resource that is required for carrying out an activity.
|
84 |
Production Planning and Detailed SchedulingTabular planning tool for interactive detailed scheduling used to interactively schedule and reschedule operations to resources.
|
85 |
Production Planning and Detailed SchedulingSuperordinate term for single mixed resources and multimixed resources.
|
86 |
Production Planning and Detailed SchedulingSetting that controls how the SAP APO system handles the available procurement proposals for a product when planning the product using the product heuristic.
|
87 |
Production Planning and Detailed SchedulingSmallest permissible time interval between the start or end dates of two order activities that are linked by a time relationship.
|
88 |
Production Planning and Detailed SchedulingThreshold value for the days' supply of a location product, below which an alert can be triggered automatically to warn the planner of a (possible) imminent bottleneck situation.
|
89 |
Production Planning and Detailed SchedulingRule that determines how the system generates the names of the setup groups from the characteristic values of a characteristic.
|
90 |
Production Planning and Detailed SchedulingA customizing setting that stores the value ranges of numerical characteristics.
|
91 |
Production Planning and Detailed SchedulingDetailed scheduling activity for newly created or deallocated operations, which is used to
|
92 |
Production Planning and Detailed SchedulingGeneric term for detailed scheduling activities.
|
93 |
Production Planning and Detailed SchedulingForecast error measurement.
|
94 |
Production Planning and Detailed SchedulingDocument informing the vendor which quantities of a product are to be delivered on which date/at which time.
|
95 |
Production Planning and Detailed SchedulingOrder status that displays if the operations of the order are scheduled or deallocated.
|
96 |
Production Planning and Detailed SchedulingMaximum allowed time interval between the start and end dates of two order activities that are linked by a time relationship.
|
97 |
Production Planning and Detailed SchedulingQuantity that must not be exceeded during procurement.
|
98 |
Production Planning and Detailed SchedulingGrouping of selection criteria in a rule that controls the reading of requirements, stock and receipt elements in the charts, "Elements", "Periods", "Quantity" and " [..]
|
99 |
Production Planning and Detailed SchedulingA setup activity whose duration depends on the setup status of the resource, that is, on which operation was previously processed on the resource.
|
100 |
Production Planning and Detailed SchedulingSpecifying the processing sequence for operations or orders.
|
101 |
Production Planning and Detailed SchedulingPP heuristic that executes a service function.
|
102 |
Production Planning and Detailed SchedulingClassification of an operation according to a characteristic that is relevant to planning and which the system is to take into account when scheduling and rescheduling operations on resources. Setup g [..]
|
103 |
Production Planning and Detailed SchedulingFine classification of a setup status within a setup group.
|
104 |
Production Planning and Detailed SchedulingContains the setup duration and setup costs involved in changing a single resource from one setup status to another, for each possible setup transition at the resource. Setup statuses are identified b [..]
|
105 |
Production Planning and Detailed SchedulingSetup matrix that contains the setup times and costs involved in changing the setup of a resource due to a change from a product with characteristic value A to a product with characteristic value B.
|
106 |
Production Planning and Detailed SchedulingStatus of the resource (for example, equipment, settings) that is necessary to process an operation and that is achieved by setting up the resource.
|
107 |
Production Planning and Detailed SchedulingTransition between two setup statuses of a resource.
|
108 |
Production Planning and Detailed SchedulingTransition from one setup status to another in which the setup key does not change. This setting is valid for all setup keys in the setup group that you have entered for this setup transition.
|
109 |
Production Planning and Detailed SchedulingOrder within a production campaign that is used to prepare the line for production. In SAP APO, a setup order is at the beginning of a production campaign and a clean-out order is at the end.
|
110 |
Production Planning and Detailed SchedulingTo shorten an activity's duration without adjusting the quantity.
|
111 |
Production Planning and Detailed SchedulingThe maximum extent to which an operation can be shrunk without changing the quantity or other parameters.
|
112 |
Production Planning and Detailed SchedulingDisplay type of a key figure schema.
|
113 |
Production Planning and Detailed SchedulingRecord of simulative planning data based on a planning version. Using a simulation version, you can run through a planning alternative without changing the data in the planning version. You can test d [..]
|
114 |
Production Planning and Detailed SchedulingType of order generation in which requirements from two orders are fulfilled by the receipts of a common order.
|
115 |
Production Planning and Detailed SchedulingResource that can be scheduled to the exact time and on which just one activity can be carried out at a time.
|
116 |
Production Planning and Detailed SchedulingA time period for a capacity variant in which the resource has a particular capacity. In the case of resources that can be scheduled continually (single-activity and multi-activity resources), you def [..]
|
117 |
Production Planning and Detailed SchedulingFunction in extended order generation with which the SAP APO system determines product receipts with specific characteristics.
|
118 |
Production Planning and Detailed SchedulingA request to transfer material from one plant to another within the same company code.
|
119 |
Production Planning and Detailed SchedulingA special operation in PP/DS related to filling or emptying of container resources.
|
120 |
Production Planning and Detailed SchedulingA resource is considered storage capable when it has storage properties.
|
121 |
Production Planning and Detailed SchedulingProfile containing the control parameters for detailed scheduling.
|
122 |
Production Planning and Detailed SchedulingTo lengthen an activity's duration without adjusting the quantity.
|
123 |
Production Planning and Detailed SchedulingThe maximum extent to which an operation can be stretched without changing the quantity or other parameters.
|
124 |
Production Planning and Detailed SchedulingTarget value for the days' supply of a location product.
|
125 |
Production Planning and Detailed SchedulingFunction used in SAP APO - when a planned order is created for a component - to determine the location for a component, a co-product, or a by-product, in which SAP APO creates the requirement for a co [..]
|
126 |
Production Planning and Detailed SchedulingProcess in external procurement in which components to be provided for a product, which is to be produced by a subcontractor, are provided by an external vendor instead of by the plant.
|
127 |
Production Planning and Detailed SchedulingInstruction to a supplier (subcontractor) to manufacture an ordered part using the products specified in the relevant "products to be provided" items.
|
128 |
Production Planning and Detailed SchedulingA process during which a product (ordered product) is manufactured by a vendor (subcontractor) who, however, requires certain components (products to be provided) in order to manufacture the product; [..]
|
129 |
Production Planning and Detailed SchedulingPeriod during which the resource can be used in planning. Outside of this period the resource is fixed and cannot be used in planning.
|
130 |
Production Planning and Detailed SchedulingProfile that lists the key components and key resources at each location. Various heuristics use the information in a profile to determine the availability of key components and resources at the linke [..]
|
131 |
Production Planning and Detailed SchedulingObject that defines
|
132 |
Production Planning and Detailed SchedulingPlanning interface in Production Planning and Detailed Scheduling used for order processing.
|
133 |
Production Planning and Detailed SchedulingThe act of dividing an order into two or more orders is called an order split. The order that retains the original order number is called the parent order. The new order(s) created by the split are ca [..]
|
134 |
Production Planning and Detailed SchedulingA collective term for the following planning screens for Production Planning and Detailed Scheduling, that are used to process or display orders:
|
135 |
Production Planning and Detailed SchedulingTime relationship between two activities that belong to different operations of an order.
|
136 |
Production Planning and Detailed SchedulingProduct, which is manufactured by a subcontractor, and for which the ordering party or a third party delivers the required components.
|
137 |
Production Planning and Detailed SchedulingProcedure in Production Planning and Detailed Scheduling that establishes the relationship between receipt elements and requirements elements of a product within a location. Using pegging, the corresp [..]
|
138 |
Production Planning and Detailed SchedulingCombination of product, location, account assignment object and planning version.
|
139 |
Production Planning and Detailed SchedulingPeriod of time in which fixed pegging relationships are to be created or deleted.
|
140 |
Production Planning and Detailed SchedulingTime segment around a requirements deadline, containing receipts which, in dynamic pegging, can be used to cover a requirement. Receipts with availability deadlines outside the pegging interval cannot [..]
|
141 |
Production Planning and Detailed SchedulingProvides an overview of the pegging relationships that exist between the receipt and requirement elements of a product. You can also maintain pegging relationships in the pegging overview manually.
|
142 |
Production Planning and Detailed SchedulingConnection between the receipt element and issue element of a product in a pegging structure.
|
143 |
Production Planning and Detailed SchedulingRule which specifies in which order the system should cover requirements in dynamic pegging and in which order the system should use the product receipts in the pegging interval to cover a requirement [..]
|
144 |
Production Planning and Detailed SchedulingStructure that describes the material flows between product receipts (purchase orders, purchase requisitions, planned orders, production orders and stocks) and product requirements (sales orders, plan [..]
|
145 |
Production Planning and Detailed SchedulingSpecifies whether the pegging relationship is a dynamic pegging or a fixed pegging relationship. For fixed pegging, a difference is also made between manual and automatic (that is, fixed pegging creat [..]
|
146 |
Production Planning and Detailed SchedulingTime relationship between two activities that belong to different operations.
|
147 |
Production Planning and Detailed SchedulingTime relationship between different orders.
|
148 |
Production Planning and Detailed SchedulingChart in the detailed scheduling planning board displaying the course over time of the product stock, the resource load or the resource fill level.
|
149 |
Production Planning and Detailed SchedulingUser-specific identifier of a profile in Detailed Scheduling.
|
150 |
Production Planning and Detailed SchedulingA definition of stock, receipt, requirement and forecast categories that are to be included in the calculation of the days' supply in the SAP Advanced Planner and Optimizer (SAP APO).
|
151 |
Production Planning and Detailed SchedulingDetailed scheduling activity in which an operation is removed from the resource schedule.
|
152 |
Production Planning and Detailed SchedulingStatus of an operation after you have deallocated it in Production Planning and Detailed Scheduling (PP/DS) using thedeallocate scheduling function. A deallocated operation does not occupy any resourc [..]
|
153 |
Production Planning and Detailed SchedulingA group of consecutive decision steps in the decision table.
|
154 |
Production Planning and Detailed SchedulingA decision problem in the decision table that is formulated using an 'If.., then...' statement.
|
155 |
Production Planning and Detailed SchedulingTable with decision steps, based on which the system determines how an operation, an order or a table row is displayed in the planning table for Production Planning and Detailed Scheduling.
|
156 |
Production Planning and Detailed SchedulingPlanned product requirement which is caused by the production of higher-level assemblies.
|
157 |
Production Planning and Detailed SchedulingOrder that has a relationship or pegging relationship to another order that must be considered during detailed scheduling.
|
158 |
Production Planning and Detailed SchedulingOperation that has a relationship to another operation that must be considered during detailed scheduling.
|
159 |
Production Planning and Detailed SchedulingPlanning process that determines which demands can be fulfilled by the existing supply, after production is complete. If the produced quantities match the quantities planned prior to this in PP/DS pla [..]
|
160 |
Production Planning and Detailed SchedulingHorizon within which the deployment runs.
|
161 |
Production Planning and Detailed SchedulingDetermining the production dates and resource assignment for orders and operations on a short-term planning level while considering constraints, such as the product availability and available capacity [..]
|
162 |
Production Planning and Detailed SchedulingPlanning activity through which
|
163 |
Production Planning and Detailed SchedulingConfigurable graphical planning tool for interactive Detailed Scheduling, that is, for the interactive scheduling and rescheduling of orders and operations.
|
164 |
Production Planning and Detailed SchedulingSet of settings you use to control how the system determines the production dates/times for orders and operations in Production Planning and Detailed Scheduling (for example, using forward scheduling [..]
|
165 |
Production Planning and Detailed SchedulingAlert that directly concerns a receipt element or a requirements element for a product.
|
166 |
Production Planning and Detailed SchedulingSpecifies in product interchangeability whether the two products or FFF classes are fully interchangeable (forward and backward) or only forward interchangeable.
|
167 |
Production Planning and Detailed SchedulingHeuristic that organizes the planning process for several products in procurement planning.
|
168 |
Production Planning and Detailed SchedulingHeuristic for detailed scheduling (DS).
|
169 |
Production Planning and Detailed SchedulingThe lengthening or shortening of an operation's duration without changing the quantity. The production rate is adjusted according to the equation rate, while the quantity remains constant.
|
170 |
Production Planning and Detailed SchedulingDS planning board chart that can be both hidden and displayed in the detailed scheduling planning board.
|
171 |
Production Planning and Detailed SchedulingTime difference between the order availability date that is too early and the requirements date.
|
172 |
Production Planning and Detailed SchedulingRecord containing explanations of the optimization result.
|
173 |
Production Planning and Detailed SchedulingSuperordinate term for orders that are used for the external procurement of products (for example purchase requisitions and purchase orders).
|
174 |
Production Planning and Detailed SchedulingType of external procurement relationship.
|
175 |
Production Planning and Detailed SchedulingProcedure that groups together requirements quantities from one or more periods to form a total requirements quantity. Lots are created on the basis of this total requirements quantity.
|
176 |
Production Planning and Detailed SchedulingIn the context of the heuristic "Stable forward scheduling", a production plan is considered feasible if:
|
177 |
Production Planning and Detailed SchedulingAn indicator, showing whether or not a production request, task or operation has been confirmed as complete in the system.
|
178 |
Production Planning and Detailed SchedulingA detailed scheduling strategy with which you schedule orders and operations, taking into account the existing resource load. A resource overload cannot occur.
|
179 |
Production Planning and Detailed SchedulingDetailed scheduling activity in which an operation is fixed to a resource, with regard to the schedule.
|
180 |
Production Planning and Detailed SchedulingOperation with the status fixed.
|
181 |
Production Planning and Detailed SchedulingStatus of an order in Production Planning.
|
182 |
Production Planning and Detailed SchedulingTime period for which a resource has been fixed in the detailed scheduling planning board, that is, the resource schedule cannot be changed during this period.
|
183 |
Production Planning and Detailed SchedulingForm of product procurement.
|
184 |
Production Planning and Detailed SchedulingSetup matrix that was automatically created by the system on the basis of setup matrices for characteristic values.
|
185 |
Production Planning and Detailed SchedulingGraphical representation of an activity, an operation or an order.
|
186 |
Production Planning and Detailed SchedulingPlanning function in Production Planning and Detailed Scheduling (PP/DS) used for solving planning problems for selected objects (products, orders, resources or line networks).
|
187 |
Production Planning and Detailed SchedulingA graphical element of an operation that is shown as changed when the operation has been moved in the detailed scheduling planning board.
|
188 |
Production Planning and Detailed SchedulingIndicates that the safety stock level or the target stock level has been violated.
|
189 |
Production Planning and Detailed SchedulingExisting unfixed receipt that matches a receipt, which a heuristic has planned new, with regard to quantity, source of supply, and other criteria.
|
190 |
Production Planning and Detailed SchedulingCriterion for calculating the lot size.
|
191 |
Production Planning and Detailed SchedulingProcedure in production planning that is used to calculate the purchase order quantities of receipts.
|
192 |
Production Planning and Detailed SchedulingA scheduling function for multi resources that is automatically executed by the system and by which the system schedules activities with the same duration and with a further common characteristic eith [..]
|
193 |
Production Planning and Detailed SchedulingA function that reads both the required and available product quantities and the specified and available lengths in ATP and planning. The system assigns the required lengths to the requirements on the [..]
|
194 |
Production Planning and Detailed SchedulingIn APO, an issue element is a requirement element. The requirement can be a dependent requirement or a planned independent requirement, such as a sales order, forecast requirement or a reservation.
|
195 |
Production Planning and Detailed SchedulingMinimum interval between two activities of different operations of an order, that is greater than the process-related minimum interval. For technical planning reasons, the interval between two activit [..]
|
196 |
Production Planning and Detailed SchedulingDetermines the time interval between the requirement (input node) and the start of the activity in project manufacturing during scheduling with planning-related minimum intervals.
|
197 |
Production Planning and Detailed SchedulingPlanning-relevant change that requires the adjustment of the planning.
|
198 |
Production Planning and Detailed SchedulingGroup of location products that must always be planned together in the procurement planning run with an MRP heuristic.
|
199 |
Production Planning and Detailed SchedulingClassification of a planning package.
|
200 |
Production Planning and Detailed SchedulingTime period in which the schedule in the DS planning board or in the production planning run can be changed.
|
201 |
Production Planning and Detailed SchedulingLocation in which a product is planned and receipts are created for the product.
|
202 |
Production Planning and Detailed SchedulingA planning interface in Production Planning and Detailed Scheduling in which all receipt elements are displayed for selected location products.
|
203 |
Production Planning and Detailed SchedulingThe status of an order in production planning.
|
204 |
Production Planning and Detailed SchedulingThe product quantity that is passed on from a receipt element to a requirement element in a pegging relationship.
|
205 |
Production Planning and Detailed SchedulingHeuristic called by the MRP heuristic for processing products in a planning package.
|
206 |
Production Planning and Detailed SchedulingTime during which a resource is not available for processing an operation.
|
207 |
Production Planning and Detailed SchedulingCosts that are incurred when executing an activity in a particular mode.
|
208 |
Production Planning and Detailed SchedulingPeriod of time until stock falls below zero.
|
209 |
Production Planning and Detailed SchedulingFunction in extended order generation that is the equivalent of characteristic propagation in the SAP APO system. Characteristics are propagated in the reverse direction, that is, passed on against th [..]
|
210 |
Production Planning and Detailed SchedulingPeriod of time used in sales order oriented planning, for example.
|
211 |
Production Planning and Detailed SchedulingSuperordinate term for orders that are used for the in-house production of products (planned orders and production orders).
|
212 |
Production Planning and Detailed SchedulingRequest for a plant to trigger the production of a product, in a specific quantity and at a specific date.
|
213 |
Production Planning and Detailed SchedulingTime span between the start date of the first activity in an order and the finish date of the last activity in that order.
|
214 |
Production Planning and Detailed SchedulingIn SAP APO, the capacity of a multiactivity resource can be modeled by specifying a number of individal resources that are available at the resource. For example, you can specify the number of identic [..]
|
215 |
Production Planning and Detailed SchedulingA detailed scheduling strategy with which you schedule orders and operations, without taking into account the existing resource load. Thus, resource overloads can occur.
|
216 |
Production Planning and Detailed SchedulingPlanning mode enabling the system to reschedule just the operations you have selected together with their dependent operations. The selected operations are scheduled on the resource for the desired da [..]
|
217 |
Production Planning and Detailed SchedulingDefines the objects (resources, products and orders) that can be displayed in the table area of the DS planning board chart. You can call up the DS planning board directly in the area menu for Product [..]
|
218 |
Production Planning and Detailed SchedulingCurve that displays the difference between the total transferred quantity and the total consumed quantity for each time.
|
219 |
Production Planning and Detailed SchedulingWork-in-process stock
|
220 |
Production Planning and Detailed SchedulingSafety stock that is not created in the liveCache as a requirement element. It is merely displayed as an MRP element in the product view. Certain functions, such as pegging, cannot therefore be used.
|
221 |
Production Planning and Detailed SchedulingA resource network in which the pegging of two I/O nodes attached to a resource is disallowed.
|
222 |
Production Planning and Detailed SchedulingEntry for a product for planning with a procurement planning heuristic in the production planning run in Production Planning and Detailed Scheduling (PP/DS).
|
223 |
Production Planning and Detailed SchedulingGroup of products
|