Meaning Production Planning and Detailed Scheduling
What does Production Planning and Detailed Scheduling mean? Here you find 223 meanings of the word Production Planning and Detailed Scheduling. You can also add a definition of Production Planning and Detailed Scheduling yourself

1

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The time-continuous capacity of a resource facilitates exact-time scheduling, in which the production dates/times are determined exactly (that is, down to the second).
Source: help.sap.com

2

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Time interval between the earliest start date of the optimized plan and the end of the last unfixed operation in the optimization horizon, that is, in the time interval to be optimized.
Source: help.sap.com

3

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Vendor who manufactures an ordered product for an ordering party, for whom required components are to be provided by the ordering party or a third party. (In subcontracting, these components are calle [..]
Source: help.sap.com

4

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Represents a stock level that should be reached through planning in order to smooth out production and cover sporadic requirements.
Source: help.sap.com

5

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Activity that the system executes immediately in Production Planning and Detailed Scheduling (PP/DS) if a planning-relevant event occurs for a product.
Source: help.sap.com

6

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Detailed scheduling activity used to assign a new date or new resources to a deallocated operation.
Source: help.sap.com

7

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Group of components of a product which form a technically coherent whole in the production process.
Source: help.sap.com

8

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Percentage of the quantity of an assembly that does not meet the required production quality.
Source: help.sap.com

9

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Planning that is executed automatically by the system.
Source: help.sap.com

10

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Date defined by the specific day and time on which the total quantity provided by the receipt element is made available. Possible receipt processing is completed on the availability date.
Source: help.sap.com

11

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Operations that can be scheduled that are scheduled before the start date of planning (that is, in the past).
Source: help.sap.com

12

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A protected period (for example, between two activities of an operation) in which you cannot schedule other activities from other operations (from other orders).
Source: help.sap.com

13

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Resource which limits the throughput capability of the production or of the entire supply chain.
Source: help.sap.com

14

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Planned non-working time during the regular working time of a resource.
Source: help.sap.com

15

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A time period.
Source: help.sap.com

16

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Determines the size and start date and time of the bucket.
Source: help.sap.com

17

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Standard procedure in the CTP process based on PP/DS buckets. SAP APO uses this procedure to execute a period-oriented capacity check and to reserve capacity for important resources.
Source: help.sap.com

18

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The resource in a mode whose working and non-working times are essential for scheduling an activity; that is, the factory calendar and the shift sequence for this resource determine on which date an a [..]
Source: help.sap.com

19

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Graphical representation of a production campaign in the resource chart of the detailed scheduling planning board.
Source: help.sap.com

20

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Color of the campaign bar that can be assigned manually or automatically for a production campaign.
Source: help.sap.com

21

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Automatic planning procedure that schedules orders at the same bottleneck resource in an optimum sequence and combines them into production campaigns. Storage costs and setup costs particular are part [..]
Source: help.sap.com

22

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Production planning process with the main aim of reducing the storage costs and setup costs for products manufactured in-house.
Source: help.sap.com

23

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Status of a production campaign that is derived from the statuses of the orders contained in the campaign.
Source: help.sap.com

24

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Describes how much productive time and how much capacity a resource requires to carry out an activity; it is therefore determined by the net duration and the resource consumption of the activity.
Source: help.sap.com

25

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The act of allocating capacity on a PP/DS resource for one or more customers.
Source: help.sap.com

26

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A container to group descriptive characteristics.
Source: help.sap.com

27

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Scheduling function by which the system tries to schedule deallocated operations or complete orders with the smallest possible time intervals between the operations.
Source: help.sap.com

28

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Heuristic for planning products for which continuous material flows (that is, continuous receipts or requirements) can occur.
Source: help.sap.com

29

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Production Planning heuristic.
Source: help.sap.com

30

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Defines which action is carried out by Production Planning and Detailed Scheduling (PP/DS) in SAP APO for each planning-relevant event that can occur for a location product, if this event occurs.
Source: help.sap.com

31

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Period such as a day or week.
Source: help.sap.com

32

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The PP/DS bucket capacity of a resource enables a period-based capacity check. A bucket may be a day, a week or a month.
Source: help.sap.com

33

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Time segment in which Production Planning and Detailed Scheduling (PP/DS) can automatically create, change, or delete receipts.
Source: help.sap.com

34

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Period during which planning for a product cannot be changed by certain procurement planning functions and heuristics.
Source: help.sap.com

35

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Classification of a message according to the message trigger.
Source: help.sap.com

36

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Minimum interval between two activities of an order. Due to procedural or technical creation restrictions, the time interval between two activities must not fall below the process-related minimum inte [..]
Source: help.sap.com

37

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Heuristic that can execute procurement planning for a product and which can therefore be used as a product heuristic.
Source: help.sap.com

38

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Profile that contains settings for optimization in Production Planning and Detailed Scheduling.
Source: help.sap.com

39

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


An area for which the system optimizes the schedule during optimization.
Source: help.sap.com

40

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Timeline that represents the filling of a product into a container resource or the removal of the product from that resource. The product flow is assigned to the activity and is a prerequisite for pla [..]
Source: help.sap.com

41

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Describes the heuristic that is entered in the location product master.
Source: help.sap.com

42

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The assignment of multiple container resources to a product belonging to a production source of supply, such as PPM or PDS.
Source: help.sap.com

43

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Order that maps the substitution of a product by another product.
Source: help.sap.com

44

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A component supplied to a subcontractor by the ordering party and/or a third party for producing the ordered product.
Source: help.sap.com

45

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Time relationship between two activities of an operation.
Source: help.sap.com

46

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Planning interface in Production Planning and Detailed Scheduling in which all requirements, stock and receipt elements are displayed for a location product.
Source: help.sap.com

47

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Combining of orders to manufacture products on a production line without having to perform major setup activities.
Source: help.sap.com

48

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A module in APO that enables the production within a plant to be planned while, at the same time, taking product and capacity constraints into account. The aim of this module is to increase throughput [..]
Source: help.sap.com

49

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Location in which the system creates the dependent requirements of the components for a product produced in-house and the receipts for the co-products and by-products.
Source: help.sap.com

50

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Production order used for discrete manufacturing.
Source: help.sap.com

51

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Execution of background planning with heuristics or planning functions.
Source: help.sap.com

52

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The usable working time for a resource. The system determines the productive time using the working time data and utilization rate for the resource as follows:
Source: help.sap.com

53

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Date on which a production order or a purchase order is created.
Source: help.sap.com

54

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Product-specific time period during which a planned order or a purchase requisition should be converted into a manufacturing order or a purchase order.
Source: help.sap.com

55

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


An SAP SCM order type, which represents a logistical view of a project that is created and executed in an external system (for example, a network in an ERP system).
Source: help.sap.com

56

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Create a production order or a purchase order, for example, manually or by converting a planned order or purchase requisition.
Source: help.sap.com

57

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Selection of resources and products for which planning can be changed.
Source: help.sap.com

58

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A time interval in minutes with which you can specify the earliest possible scheduling time for operations.
Source: help.sap.com

59

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A scheduling heuristic that creates a feasible master production schedule starting with raw materials and semi-finished products for which no requirements exist in the system. If no consumer is availa [..]
Source: help.sap.com

60

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Subfunction in extended order generation.
Source: help.sap.com

61

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Element of an order that represents the availability date and the quantity of a product that is provided by the order (see also order).
Source: help.sap.com

62

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Quantity of a product that is provided by a receipt.
Source: help.sap.com

63

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Resource that you use to define the capacity of another resource.
Source: help.sap.com

64

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The linking between the start and end time points between two activities within an order (order-internal relationship) or between two activities from different orders (cross-order relationship).
Source: help.sap.com

65

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Gantt diagram in the DS planning board in which the position of operations or orders at the resources and the relationships between these objects (time relationships or pegging relationships) are disp [..]
Source: help.sap.com

66

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Lead time for all orders that belong to a pegging structure.
Source: help.sap.com

67

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Property of a quantity denoting that it is relevant to the net requirement calculation and to dynamic pegging.
Source: help.sap.com

68

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Heuristic for Repetitive Manufacturing (REM).
Source: help.sap.com

69

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Scheduling situation at a resource with several overlapping operations.
Source: help.sap.com

70

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Enhancement for order generation in Production Planning and Detailed Scheduling (PP/DS).
Source: help.sap.com

71

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A heuristic that enables flexible finite scheduling (bucket or time-continuous) on alternative resources, modes, or sources of supply, in order to meet due dates and to minimize setup times on the sch [..]
Source: help.sap.com

72

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Planning run with an MRP heuristic.
Source: help.sap.com

73

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Threshold value for the days' supply of a location product, below which procurement proposals should be created for the location product.
Source: help.sap.com

74

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Heuristic that can process products in the sequence of their low-level codes.
Source: help.sap.com

75

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


DS planning board chart that is always displayed in the detailed scheduling planning board and cannot be manually hidden or displayed.
Source: help.sap.com

76

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Position on the production line where you can backflush.
Source: help.sap.com

77

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


An order that is created using Multiple Output Planning (MOP). An MOP order can contain just one operation - to divide a product - and a requirement node relevant to the division because only the char [..]
Source: help.sap.com

78

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The quantity of a product that is required in a location at a specific date.
Source: help.sap.com

79

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Date and time at which a product is required.
Source: help.sap.com

80

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Element of an order that represents the requirements date and a requirements quantity for a product required by the order.
Source: help.sap.com

81

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Planning interface in Production Planning and Detailed Scheduling in which all requirements elements are displayed for selected location products.
Source: help.sap.com

82

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Detailed scheduling activity used to determine a new date or new resources for a scheduled operation, on which the operation should be processed.
Source: help.sap.com

83

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Capacity of a resource that is required for carrying out an activity.
Source: help.sap.com

84

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Tabular planning tool for interactive detailed scheduling used to interactively schedule and reschedule operations to resources.
Source: help.sap.com

85

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Superordinate term for single mixed resources and multimixed resources.
Source: help.sap.com

86

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Setting that controls how the SAP APO system handles the available procurement proposals for a product when planning the product using the product heuristic.
Source: help.sap.com

87

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Smallest permissible time interval between the start or end dates of two order activities that are linked by a time relationship.
Source: help.sap.com

88

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Threshold value for the days' supply of a location product, below which an alert can be triggered automatically to warn the planner of a (possible) imminent bottleneck situation.
Source: help.sap.com

89

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Rule that determines how the system generates the names of the setup groups from the characteristic values of a characteristic.
Source: help.sap.com

90

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A customizing setting that stores the value ranges of numerical characteristics.
Source: help.sap.com

91

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Detailed scheduling activity for newly created or deallocated operations, which is used to
Source: help.sap.com

92

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Generic term for detailed scheduling activities.
Source: help.sap.com

93

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Forecast error measurement.
Source: help.sap.com

94

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Document informing the vendor which quantities of a product are to be delivered on which date/at which time.
Source: help.sap.com

95

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Order status that displays if the operations of the order are scheduled or deallocated.
Source: help.sap.com

96

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Maximum allowed time interval between the start and end dates of two order activities that are linked by a time relationship.
Source: help.sap.com

97

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Quantity that must not be exceeded during procurement.
Source: help.sap.com

98

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Grouping of selection criteria in a rule that controls the reading of requirements, stock and receipt elements in the charts, "Elements", "Periods", "Quantity" and " [..]
Source: help.sap.com

99

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A setup activity whose duration depends on the setup status of the resource, that is, on which operation was previously processed on the resource.
Source: help.sap.com

100

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Specifying the processing sequence for operations or orders.
Source: help.sap.com

101

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


PP heuristic that executes a service function.
Source: help.sap.com

102

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Classification of an operation according to a characteristic that is relevant to planning and which the system is to take into account when scheduling and rescheduling operations on resources. Setup g [..]
Source: help.sap.com

103

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Fine classification of a setup status within a setup group.
Source: help.sap.com

104

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Contains the setup duration and setup costs involved in changing a single resource from one setup status to another, for each possible setup transition at the resource. Setup statuses are identified b [..]
Source: help.sap.com

105

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Setup matrix that contains the setup times and costs involved in changing the setup of a resource due to a change from a product with characteristic value A to a product with characteristic value B.
Source: help.sap.com

106

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Status of the resource (for example, equipment, settings) that is necessary to process an operation and that is achieved by setting up the resource.
Source: help.sap.com

107

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Transition between two setup statuses of a resource.
Source: help.sap.com

108

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Transition from one setup status to another in which the setup key does not change. This setting is valid for all setup keys in the setup group that you have entered for this setup transition.
Source: help.sap.com

109

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Order within a production campaign that is used to prepare the line for production. In SAP APO, a setup order is at the beginning of a production campaign and a clean-out order is at the end.
Source: help.sap.com

110

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


To shorten an activity's duration without adjusting the quantity.
Source: help.sap.com

111

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The maximum extent to which an operation can be shrunk without changing the quantity or other parameters.
Source: help.sap.com

112

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Display type of a key figure schema.
Source: help.sap.com

113

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Record of simulative planning data based on a planning version. Using a simulation version, you can run through a planning alternative without changing the data in the planning version. You can test d [..]
Source: help.sap.com

114

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Type of order generation in which requirements from two orders are fulfilled by the receipts of a common order.
Source: help.sap.com

115

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Resource that can be scheduled to the exact time and on which just one activity can be carried out at a time.
Source: help.sap.com

116

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A time period for a capacity variant in which the resource has a particular capacity. In the case of resources that can be scheduled continually (single-activity and multi-activity resources), you def [..]
Source: help.sap.com

117

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Function in extended order generation with which the SAP APO system determines product receipts with specific characteristics.
Source: help.sap.com

118

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A request to transfer material from one plant to another within the same company code.
Source: help.sap.com

119

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A special operation in PP/DS related to filling or emptying of container resources.
Source: help.sap.com

120

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A resource is considered storage capable when it has storage properties.
Source: help.sap.com

121

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Profile containing the control parameters for detailed scheduling.
Source: help.sap.com

122

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


To lengthen an activity's duration without adjusting the quantity.
Source: help.sap.com

123

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The maximum extent to which an operation can be stretched without changing the quantity or other parameters.
Source: help.sap.com

124

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Target value for the days' supply of a location product.
Source: help.sap.com

125

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Function used in SAP APO - when a planned order is created for a component - to determine the location for a component, a co-product, or a by-product, in which SAP APO creates the requirement for a co [..]
Source: help.sap.com

126

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Process in external procurement in which components to be provided for a product, which is to be produced by a subcontractor, are provided by an external vendor instead of by the plant.
Source: help.sap.com

127

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Instruction to a supplier (subcontractor) to manufacture an ordered part using the products specified in the relevant "products to be provided" items.
Source: help.sap.com

128

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A process during which a product (ordered product) is manufactured by a vendor (subcontractor) who, however, requires certain components (products to be provided) in order to manufacture the product; [..]
Source: help.sap.com

129

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Period during which the resource can be used in planning. Outside of this period the resource is fixed and cannot be used in planning.
Source: help.sap.com

130

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Profile that lists the key components and key resources at each location. Various heuristics use the information in a profile to determine the availability of key components and resources at the linke [..]
Source: help.sap.com

131

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Object that defines
Source: help.sap.com

132

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Planning interface in Production Planning and Detailed Scheduling used for order processing.
Source: help.sap.com

133

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The act of dividing an order into two or more orders is called an order split. The order that retains the original order number is called the parent order. The new order(s) created by the split are ca [..]
Source: help.sap.com

134

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A collective term for the following planning screens for Production Planning and Detailed Scheduling, that are used to process or display orders:
Source: help.sap.com

135

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Time relationship between two activities that belong to different operations of an order.
Source: help.sap.com

136

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Product, which is manufactured by a subcontractor, and for which the ordering party or a third party delivers the required components.
Source: help.sap.com

137

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Procedure in Production Planning and Detailed Scheduling that establishes the relationship between receipt elements and requirements elements of a product within a location. Using pegging, the corresp [..]
Source: help.sap.com

138

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Combination of product, location, account assignment object and planning version.
Source: help.sap.com

139

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Period of time in which fixed pegging relationships are to be created or deleted.
Source: help.sap.com

140

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Time segment around a requirements deadline, containing receipts which, in dynamic pegging, can be used to cover a requirement. Receipts with availability deadlines outside the pegging interval cannot [..]
Source: help.sap.com

141

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Provides an overview of the pegging relationships that exist between the receipt and requirement elements of a product. You can also maintain pegging relationships in the pegging overview manually.
Source: help.sap.com

142

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Connection between the receipt element and issue element of a product in a pegging structure.
Source: help.sap.com

143

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Rule which specifies in which order the system should cover requirements in dynamic pegging and in which order the system should use the product receipts in the pegging interval to cover a requirement [..]
Source: help.sap.com

144

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Structure that describes the material flows between product receipts (purchase orders, purchase requisitions, planned orders, production orders and stocks) and product requirements (sales orders, plan [..]
Source: help.sap.com

145

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Specifies whether the pegging relationship is a dynamic pegging or a fixed pegging relationship. For fixed pegging, a difference is also made between manual and automatic (that is, fixed pegging creat [..]
Source: help.sap.com

146

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Time relationship between two activities that belong to different operations.
Source: help.sap.com

147

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Time relationship between different orders.
Source: help.sap.com

148

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Chart in the detailed scheduling planning board displaying the course over time of the product stock, the resource load or the resource fill level.
Source: help.sap.com

149

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


User-specific identifier of a profile in Detailed Scheduling.
Source: help.sap.com

150

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A definition of stock, receipt, requirement and forecast categories that are to be included in the calculation of the days' supply in the SAP Advanced Planner and Optimizer (SAP APO).
Source: help.sap.com

151

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Detailed scheduling activity in which an operation is removed from the resource schedule.
Source: help.sap.com

152

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Status of an operation after you have deallocated it in Production Planning and Detailed Scheduling (PP/DS) using thedeallocate scheduling function. A deallocated operation does not occupy any resourc [..]
Source: help.sap.com

153

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A group of consecutive decision steps in the decision table.
Source: help.sap.com

154

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A decision problem in the decision table that is formulated using an 'If.., then...' statement.
Source: help.sap.com

155

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Table with decision steps, based on which the system determines how an operation, an order or a table row is displayed in the planning table for Production Planning and Detailed Scheduling.
Source: help.sap.com

156

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Planned product requirement which is caused by the production of higher-level assemblies.
Source: help.sap.com

157

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Order that has a relationship or pegging relationship to another order that must be considered during detailed scheduling.
Source: help.sap.com

158

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Operation that has a relationship to another operation that must be considered during detailed scheduling.
Source: help.sap.com

159

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Planning process that determines which demands can be fulfilled by the existing supply, after production is complete. If the produced quantities match the quantities planned prior to this in PP/DS pla [..]
Source: help.sap.com

160

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Horizon within which the deployment runs.
Source: help.sap.com

161

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Determining the production dates and resource assignment for orders and operations on a short-term planning level while considering constraints, such as the product availability and available capacity [..]
Source: help.sap.com

162

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Planning activity through which
Source: help.sap.com

163

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Configurable graphical planning tool for interactive Detailed Scheduling, that is, for the interactive scheduling and rescheduling of orders and operations.
Source: help.sap.com

164

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Set of settings you use to control how the system determines the production dates/times for orders and operations in Production Planning and Detailed Scheduling (for example, using forward scheduling [..]
Source: help.sap.com

165

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Alert that directly concerns a receipt element or a requirements element for a product.
Source: help.sap.com

166

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Specifies in product interchangeability whether the two products or FFF classes are fully interchangeable (forward and backward) or only forward interchangeable.
Source: help.sap.com

167

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Heuristic that organizes the planning process for several products in procurement planning.
Source: help.sap.com

168

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Heuristic for detailed scheduling (DS).
Source: help.sap.com

169

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The lengthening or shortening of an operation's duration without changing the quantity. The production rate is adjusted according to the equation rate, while the quantity remains constant.
Source: help.sap.com

170

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


DS planning board chart that can be both hidden and displayed in the detailed scheduling planning board.
Source: help.sap.com

171

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Time difference between the order availability date that is too early and the requirements date.
Source: help.sap.com

172

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Record containing explanations of the optimization result.
Source: help.sap.com

173

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Superordinate term for orders that are used for the external procurement of products (for example purchase requisitions and purchase orders).
Source: help.sap.com

174

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Type of external procurement relationship.
Source: help.sap.com

175

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Procedure that groups together requirements quantities from one or more periods to form a total requirements quantity. Lots are created on the basis of this total requirements quantity.
Source: help.sap.com

176

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


In the context of the heuristic "Stable forward scheduling", a production plan is considered feasible if:
Source: help.sap.com

177

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


An indicator, showing whether or not a production request, task or operation has been confirmed as complete in the system.
Source: help.sap.com

178

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A detailed scheduling strategy with which you schedule orders and operations, taking into account the existing resource load. A resource overload cannot occur.
Source: help.sap.com

179

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Detailed scheduling activity in which an operation is fixed to a resource, with regard to the schedule.
Source: help.sap.com

180

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Operation with the status fixed.
Source: help.sap.com

181

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Status of an order in Production Planning.
Source: help.sap.com

182

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Time period for which a resource has been fixed in the detailed scheduling planning board, that is, the resource schedule cannot be changed during this period.
Source: help.sap.com

183

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Form of product procurement.
Source: help.sap.com

184

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Setup matrix that was automatically created by the system on the basis of setup matrices for characteristic values.
Source: help.sap.com

185

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Graphical representation of an activity, an operation or an order.
Source: help.sap.com

186

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Planning function in Production Planning and Detailed Scheduling (PP/DS) used for solving planning problems for selected objects (products, orders, resources or line networks).
Source: help.sap.com

187

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A graphical element of an operation that is shown as changed when the operation has been moved in the detailed scheduling planning board.
Source: help.sap.com

188

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Indicates that the safety stock level or the target stock level has been violated.
Source: help.sap.com

189

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Existing unfixed receipt that matches a receipt, which a heuristic has planned new, with regard to quantity, source of supply, and other criteria.
Source: help.sap.com

190

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Criterion for calculating the lot size.
Source: help.sap.com

191

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Procedure in production planning that is used to calculate the purchase order quantities of receipts.
Source: help.sap.com

192

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A scheduling function for multi resources that is automatically executed by the system and by which the system schedules activities with the same duration and with a further common characteristic eith [..]
Source: help.sap.com

193

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A function that reads both the required and available product quantities and the specified and available lengths in ATP and planning. The system assigns the required lengths to the requirements on the [..]
Source: help.sap.com

194

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


In APO, an issue element is a requirement element. The requirement can be a dependent requirement or a planned independent requirement, such as a sales order, forecast requirement or a reservation.
Source: help.sap.com

195

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Minimum interval between two activities of different operations of an order, that is greater than the process-related minimum interval. For technical planning reasons, the interval between two activit [..]
Source: help.sap.com

196

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Determines the time interval between the requirement (input node) and the start of the activity in project manufacturing during scheduling with planning-related minimum intervals.
Source: help.sap.com

197

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Planning-relevant change that requires the adjustment of the planning.
Source: help.sap.com

198

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Group of location products that must always be planned together in the procurement planning run with an MRP heuristic.
Source: help.sap.com

199

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Classification of a planning package.
Source: help.sap.com

200

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Time period in which the schedule in the DS planning board or in the production planning run can be changed.
Source: help.sap.com

201

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Location in which a product is planned and receipts are created for the product.
Source: help.sap.com

202

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A planning interface in Production Planning and Detailed Scheduling in which all receipt elements are displayed for selected location products.
Source: help.sap.com

203

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The status of an order in production planning.
Source: help.sap.com

204

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


The product quantity that is passed on from a receipt element to a requirement element in a pegging relationship.
Source: help.sap.com

205

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Heuristic called by the MRP heuristic for processing products in a planning package.
Source: help.sap.com

206

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Time during which a resource is not available for processing an operation.
Source: help.sap.com

207

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Costs that are incurred when executing an activity in a particular mode.
Source: help.sap.com

208

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Period of time until stock falls below zero.
Source: help.sap.com

209

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Function in extended order generation that is the equivalent of characteristic propagation in the SAP APO system. Characteristics are propagated in the reverse direction, that is, passed on against th [..]
Source: help.sap.com

210

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Period of time used in sales order oriented planning, for example.
Source: help.sap.com

211

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Superordinate term for orders that are used for the in-house production of products (planned orders and production orders).
Source: help.sap.com

212

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Request for a plant to trigger the production of a product, in a specific quantity and at a specific date.
Source: help.sap.com

213

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Time span between the start date of the first activity in an order and the finish date of the last activity in that order.
Source: help.sap.com

214

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


In SAP APO, the capacity of a multiactivity resource can be modeled by specifying a number of individal resources that are available at the resource. For example, you can specify the number of identic [..]
Source: help.sap.com

215

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A detailed scheduling strategy with which you schedule orders and operations, without taking into account the existing resource load. Thus, resource overloads can occur.
Source: help.sap.com

216

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Planning mode enabling the system to reschedule just the operations you have selected together with their dependent operations. The selected operations are scheduled on the resource for the desired da [..]
Source: help.sap.com

217

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Defines the objects (resources, products and orders) that can be displayed in the table area of the DS planning board chart. You can call up the DS planning board directly in the area menu for Product [..]
Source: help.sap.com

218

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Curve that displays the difference between the total transferred quantity and the total consumed quantity for each time.
Source: help.sap.com

219

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Work-in-process stock
Source: help.sap.com

220

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Safety stock that is not created in the liveCache as a requirement element. It is merely displayed as an MRP element in the product view. Certain functions, such as pegging, cannot therefore be used.
Source: help.sap.com

221

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


A resource network in which the pegging of two I/O nodes attached to a resource is disallowed.
Source: help.sap.com

222

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Entry for a product for planning with a procurement planning heuristic in the production planning run in Production Planning and Detailed Scheduling (PP/DS).
Source: help.sap.com

223

0 Thumbs up   0 Thumbs down

Production Planning and Detailed Scheduling


Group of products
Source: help.sap.com





<< Contract Billing SAP EHS Management >>

Dictionary.university is a dictionary written by people like you and me.