|
sdge.com
Upvotes received | 0 |
Downvotes received | 1 |
Karma: | 0 (upvotes-downvotes) |
|
0 earned Badges No badges were found
Definitions (20)
1 |
0
0
auditing
Process by which a random sample of contractor work is field reviewed for completion and data accuracy by a trained and experienced auditor.
Meaning awaits approval from a moderator |
2 |
0
0
chemical pole brushing
Work activity within the pole brushing maintenance cycle where contractor conducts both chemical assessment and chemical application on approved SDG&E poles. This activity normally occurs in the late fall and winter months.
Meaning awaits approval from a moderator |
3 |
0
0
clearance
The distance measured, usually in feet, between vegetation and the nearest energized SDG&E conductor or facility.
Meaning awaits approval from a moderator |
4 |
0
0
compliance
General term used in reference to the condition of a tree or wood pole as it relates to the applicable law, rule or regulation. For example, a tree growing within three (3) feet of a 12kV power line would be out of compliance with California Public Resources Code (PRC), Section 4293 which requires four (4) feet clearance at all times.
Meaning awaits approval from a moderator |
5 |
0
0
corrective maintenance program
The CMP is a maintenance program for SDG&E’s electric distribution system mandated by the California Public Utilities Commission (CPUC).
Meaning awaits approval from a moderator |
6 |
0
0
diameter at breast height
Measurement of tree diameter, in inches, taken at 4 ½ feet above ground level. For trees growing on slopes, the measurement is taken on the uphill side of the tree.
Meaning awaits approval from a moderator |
7 |
0
0
environmentally sensitive area
Area within the SDG&E service territory determined to be environmentally sensitive by the Environmental Services department protocols. Work activities may be restricted or prohibited in ESAs.
Meaning awaits approval from a moderator |
8 |
0
0
inventory tree
Tree with potential to grow into, or fall into, SDG&E primary distribution or transmission overhead electrical facilities within three (3) years from the date of inspection. Refer to SDG&E Pre-inspection Guidelines for more detailed information.
Meaning awaits approval from a moderator |
9 |
0
0
local responsibility area
Geographic area within the SDG&E service territory where the local fire department (not state) has primary fire suppression responsibility. Note: CPUC General Order 95, Rule 35, applies to LRAs.
Meaning awaits approval from a moderator |
10 |
0
0
maintenance cycle
Time period between the scheduled start date of a vegetation management activity and the next scheduled start date for the same activity. SDG&E is currently on a one-year maintenance cycle for key program work activities (tree pruning and pole brushing).
Meaning awaits approval from a moderator |
To view all 20 definitions, please sign in.